91 photos

8/6/23: Foyer; arches will be bricked8/6/23: Foyer looking into family room1/28/04: Foyer, pecky cypress ceiling and beams installed.4/16/23: 1st floor bar; Tyvek covering complete; windows in.10/29/23: 1st floor bar; sheetrock and primer completed3/11/23: Family room from ktichen; foyer to right; pantry to far8/6/23: Family room from ktichen; fireplace behind sheetrock, fo10/29/23: Kitchen, dining, living area sheetrock installed1/28/04:  Kitchen, dining, living area floors and overhead beams4/16/23: Kitchen framed out8/6/23: Looking into kitchen from family room; staircase and bar1/28/04:  Kitchen and dining room, floors and overhead beams and10/29/23: Kitchen; sheetrock and ceiling installed1/28/04:  Kitchen, dining, living area floors and overhead beams3/5/23: Master bedroom framed out.8/6/23: Master bedroom; left wall will be built-in shelves / dra10/29/23: Master bedroom; sheetrock installed1/28/04: Master bedroom, floors and pecky cypress ceiling instal4/16/23: Master bath shower framed out8/6/23: Master bath; arch over shower; closets left and right

Categories & Keywords
Category:
Subcategory:
Subcategory Detail:
Keywords: